Whole flow · step 10 of 11
Final validation
After the proofreader approves, every automated check runs again on the final text. Nothing can be published until all mandatory checks pass.
The German job has not been approved in the workbench in this session
Approve it in the workbench, or approve it here to continue the demo.
Approval
- Approved by
- Not yet approved
- Units decided
- 138 of 138 · 41 edited · 0 sent back
- Source queries
- SQ-0112 answered by Thomas Meier
- Terminology proposals
- TP-0457 (door blocking clamp) pending
Run again on the final text
- Deterministic checksWaiting
- Terminology validationWaiting
- Edited units reinsertedWaiting
Reconstruction integrity
- All units presentWaiting
- No duplicated unitsWaiting
- Order matches the sourceWaiting
- Protected content unchangedWaiting
- DITA schema validWaiting
- Windchill import dry run passesWaiting
Document consistency
- Terminology consistent across the documentWaiting
- Repeated labels consistentWaiting
- No English left in the targetWaiting
- Cross-references resolveWaiting
Draft PDF from publishPDFDraft
- No text overflow in tables or hazard boxesWaiting
- Fonts embeddedWaiting
- Page count within profileWaiting
Publication locked
16 of 16 mandatory checks still to pass.
Translation Memory update
On publication, 138 approved units are written to TM de-DE, each with its provenance:
source and target, source revision, context and domain, approval route and reviewer, model, prompt and terminology versions, findings and final result, date, origin document, language job and request.
Never written to the TM
- Draft AI output0
- Failed correction attempts0
- Units with unresolved findings0
- Units tied to an obsolete source0
Question for the workshop
Is a GTL sign-off needed after the proofreader approves, or is the proofreader's approval final?